Error message

  • Notice: Undefined offset: 1 in user_node_load() (line 3571 of /imedia/users/Abacus-Gloal/htdocs/modules/user/user.module).
  • Notice: Trying to get property of non-object in user_node_load() (line 3571 of /imedia/users/Abacus-Gloal/htdocs/modules/user/user.module).
  • Notice: Undefined offset: 1 in user_node_load() (line 3572 of /imedia/users/Abacus-Gloal/htdocs/modules/user/user.module).
  • Notice: Trying to get property of non-object in user_node_load() (line 3572 of /imedia/users/Abacus-Gloal/htdocs/modules/user/user.module).
  • Notice: Undefined offset: 1 in user_node_load() (line 3573 of /imedia/users/Abacus-Gloal/htdocs/modules/user/user.module).
  • Notice: Trying to get property of non-object in user_node_load() (line 3573 of /imedia/users/Abacus-Gloal/htdocs/modules/user/user.module).

Abacus wins Descon Engineering’s Job Analysis Project
Abacus has won the project to analyze and evaluate 100 top and crucial positions for Descon Engineering, the largest engineering firm in Pakistan and a major player in the region serving the oil and gas, chemical, petrochemical, cement, power and infrastructure sectors.

Using Mercer’s state of the art International Position Evaluation System, the team from Abacus will interview each incumbent, prepare their role clarification documents and evaluate each position. A detailed compensation and benefit study would also take place to restructure Descon’s rewards strategy.